Supersniper Vs Bushnell Elite

clinker bricks around it!

Today was more clinkers, the same with two construction teams! The clinker takes place already around the house, the photos of today are about 14 clock when I was with Paul was on site. Stephan is against 17 clock has not been there and seen brick work under the lights.
Our door range:

wall in cross-section:

view from the street:

At this corner of the house can be next to see the first finished brick wall, on the right work in progress. These must still be out of the mortar scratched the surface again, as well as the surface is scrubbed again. Eventually, the clinker is then grouted still light. We have deliberately opted for a bright grouting so that the area not only "dark" look. For all Viebrock Insider: Fallingbostel is in the house with our bricks - but jointed dark.

Here we can see, such as between the white stones and the bricks before the yellow insulation mats are attached:
















Now I'm looking forward overnight! Since it is determined again an able step must be visible. PS: It poured all day by the way ...