Shell installations

Today began the work of the body shop installing electrical / plumbing and drywall. It can be seen a few things:
The DG is already insulated ...

... here with our Velux windows in the hallway above. Stephan says, it looks at once all small ...

The DG-ceiling is already here! Here the open permanent breakthrough in the bottom stair.

The living room door. The EC can be seen everywhere already drilled holes for electrical outlets and switches.

Then the first cables were already installed ...

... and the windows were again active and the masons bricked the window sills "around the house.

The gable window in the attic also got a nice window seat.