A meeting with our construction manager took us to the construction site this afternoon and we found many cable, and walls in the attic! A view from scaffolding onto our roof overhang above the front door.
through the bathroom door (red steel frame) you can already see the T-bar wall in which the sinks are attached.
morning are likely in the afternoon the walls in the DG.
0 comments:
Post a Comment