Tuesday, October 27, 2009
Monday, October 26, 2009
Side Effects From Ultrasonic Pest Repellent
Sunday, October 25, 2009
Muscle Milk® Collegiate
Friday, October 23, 2009
Old Areas To Live Portland, Or
channel assembly and house delivery
Many things happened .. and I've barely time to write.
sprint is announced!
The parquet layers unfortunately had to fill the floor completely, because he was too uneven (
Today they could begin, therefore, only to lay the parquet glue and
The kitchen and the office are already finished in the DG was started in the dressing room at the... Monatg comes the kitchen!! Afterwards we continue in the living room and dining room with parquet.
end of next week will be moved! On Thursday, the channel
were cleaner since! The channel was definitely tight. With the camera all that was being examined closely. After a high-pressure irrigation works now everything again. And the bill goes to Bürkle! Everything went smoothly.
Am I happy !!!!!!!!!!!!!!!!!!!!!
Yes and then there was the house delivery ....
in 2 hours was discussed together with our construction manager and any area examined. All minor and major defects were recorded and some have eliminated the same. Everything else should go the next 2 weeks on the stage.
Since we are curious. From the electricians, we are a bit disappointed. So many things that are incomplete or incorrect ... the hardness, the wrong shutter mounted switch. Arrow up means to us now, Rollo is going down and turned !?!?!?!?!?!!?!?!?!?!?!?! And the functioning of all blinds up on a ..... the other does not yet ... as I said we are seeing.
Here are pictures of the unwrapped door
parquet pictures will follow tomorrow.
Many things happened .. and I've barely time to write.
sprint is announced!
The parquet layers unfortunately had to fill the floor completely, because he was too uneven (
Today they could begin, therefore, only to lay the parquet glue and
The kitchen and the office are already finished in the DG was started in the dressing room at the... Monatg comes the kitchen!! Afterwards we continue in the living room and dining room with parquet.
end of next week will be moved! On Thursday, the channel
were cleaner since! The channel was definitely tight. With the camera all that was being examined closely. After a high-pressure irrigation works now everything again. And the bill goes to Bürkle! Everything went smoothly.
Am I happy !!!!!!!!!!!!!!!!!!!!!
Yes and then there was the house delivery ....
in 2 hours was discussed together with our construction manager and any area examined. All minor and major defects were recorded and some have eliminated the same. Everything else should go the next 2 weeks on the stage.
Since we are curious. From the electricians, we are a bit disappointed. So many things that are incomplete or incorrect ... the hardness, the wrong shutter mounted switch. Arrow up means to us now, Rollo is going down and turned !?!?!?!?!?!!?!?!?!?!?!?! And the functioning of all blinds up on a ..... the other does not yet ... as I said we are seeing.
Here are pictures of the unwrapped door
parquet pictures will follow tomorrow.
Monday, October 19, 2009
Who Sells Lemon Coolers
times more water, cleaning, stairs and electrical
yesterday we again run over a water wave. Our
runoff does not run again. Ie the water that normally runs in the channel backs up, until it in the basement space at another outlet runs out again (fortunately there are, otherwise the house would probably ausm loo etc ...) looks
On Thursday, the whole a channel man with the camera. Our company Bürkle Keller takes over for the cost if it is due to their work ... I'm curious.
The electricians are also back and install the sockets, light switches, thermostats and so on.
The countdown is on. In 12 days of the move is great:)
Today was also the baseboards in the bathroom attached.
Also
edge of the bathtub are now tiled surround.
The staircase is now complete. We can now reach all floors very easy * juhuuu *
yesterday we again run over a water wave. Our
runoff does not run again. Ie the water that normally runs in the channel backs up, until it in the basement space at another outlet runs out again (fortunately there are, otherwise the house would probably ausm loo etc ...) looks
On Thursday, the whole a channel man with the camera. Our company Bürkle Keller takes over for the cost if it is due to their work ... I'm curious.
The electricians are also back and install the sockets, light switches, thermostats and so on.
The countdown is on. In 12 days of the move is great:)
Today was also the baseboards in the bathroom attached.
Also
edge of the bathtub are now tiled surround.
The staircase is now complete. We can now reach all floors very easy * juhuuu *
Saturday, October 17, 2009
Standard Nba Knee Brace
Thursday, October 15, 2009
Effects Of Wearing A Tight Brasier
staircase cleaning the guest bathroom and 2nd
Here are the photos of the guest bathroom and the external plaster.
The plaster is now almost finished, tomorrow I'll then clean images without scaffolding! :)
The heated surfaces are all dry. Only the part in front of the oven, without underfloor heating is a bit wetter. Therefore, we will make clean now in a week NEN dehumidifier.
And there is news about future planning!
Wednesday next week will be moved to the floor. Probably at the end of the week is finished.
Thursday (today in ner week) home delivery.
The week is already the kitchen!
means we will probably move in 2.5 weeks!!
means we will probably move in 2.5 weeks!!
all who want to help you register please:)
juhuuuuuuuu
Subscribe to:
Posts (Atom)